PPT Slide
Science and Mission Operations
IMAGE Launch and In-Orbit-Checkout (IOC)
- LMMS to support from both SMOC and via remote tie-in
- The mission operations team will consist of the Spacecraft
Control Team (SCT) personnel augmented with staff from
the instrument and spacecraft development team
- Final checkout period from Mission Elapsed Time 26 to ~50
days is planned within nominal operations baseline