PPT Slide
SMOC Telemetry Requirements
- The ground system shall process the subset of CCSDS telemetry as defined in the Spacecraft to Ground ICD.
- Processing the data includes extracting source packets from telemetry frames and extracting data from the source packets.
- The ground shall calibrate and convert individual telemetry parameters based on the Project Data Base.
- The ground system shall support two sets of high/low limit checking on both analog and discrete telemetry parameters and check delta and rail limits.