IMAGE Early Orbit Operations Going Well!
Spacecraft: All sub-systems are healthy and operating nominally
Re-orientation with spin-axis to normal completed
Nutation eliminated with magnetic torquer procedure
Real-time and store/dump telemetry modes tested and nominal
Instruments: All instruments are working nominally and out-gassing; high voltages have been cycled on
HENA: high energy neutral atom camera. (APL)
MENA: medium energy neutral atom camera. (SwRI)
LENA: low energy neutral atom camera (GSFC)
EUV: extreme UV cold plasma (He+) camera. (UAz)
FUV: far UV (auroral) camera. (UCB)
RPI: radio plasma imager. (UML)
Planning for a "first light" press conference at AGU
Science measurement will begin on ~May 15, 2000
Next Page
Graphic Version
Powerpoint Slides